Sunday, February 24, 2013

The Tunnel of Love

Prepped cam by pressing in a new key and test fitting the driven gear over the snout.
Homemade cam handle threaded into cam.

Then the bearing journals were coated with assy lube, and yet another chemical was used, Lobe Grease.
Applied liberally to all lobes, except for 1 and 2 lobes just yet.


Cam bearings were lubed up.



And the cam was gingerly mated to the block.
Easy, peezy, japaneezy....



 
 The 1 and 2 lobes were lubed up before the last of the cam was sent home.

Time to degree the bad boy.


No comments:

Post a Comment